As a supplier of automated storage retrieval machines (AS/RS), I get asked one question more than any other during customer consultations: “Can we relocate our AS/RS once it’s installed?” It’s a fair question. When a company invests hundreds of thousands of dollars—sometimes millions—in a system designed to cram 20% more inventory into 10% less floor space, expand picking speed, and cut labor costs by half, moving that entire infrastructure feels like risking everything. But over 12 years of working with 70+ facilities across North America, I’ve seen it done successfully three dozen times—and I’ve also seen teams make costly mistakes when they skipped the planning. Let’s break down what actually goes into relocating an AS/RS, why it’s not a one-size-fits-all answer, and what you need to know before you even pick up a wrench. Automated Storage Retrieval Machine

First, let’s clarify: AS/RS isn’t a single machine—it’s a integrated system that ranges from small, desktop robotic lifts for e-commerce order fulfillment warehouses to massive, multi-level cranes that span 100 feet of ceiling height and hold 50,000 pallets. The question of “relocation” splits into two parts: relocating a whole system, like when a company moves its entire headquarters to a new state, or relocating a single module, like adding a new crane to a satellite warehouse that’s outgrown its original capacity. Both are possible, but they require very different steps.

Let’s start with the basics of what makes an AS/RS move feasible. Unlike forklifts or conveyor belts, AS/RS relies on precision engineering. The cranes operate within a tolerance of a quarter-inch—any shift in the building’s foundation, ceiling height, or floor structure can throw off their ability to retrieve inventory without crashing. That’s why the first step in any relocation audit (the free assessment we offer every potential moving client) is a structural survey of both the old and new facility. For example, two years ago, a consumer electronics brand in Chicago wanted to move their mini-load AS/RS—used for storing small parts like phone chargers and batteries—from a 5-year-old industrial building to a renovated old warehouse in the same city. The original building’s floors had a uniform load rating of 120 pounds per square foot, perfect for the system’s modules. The new warehouse, built in 1920, had a portion of its floor rated at only 80 PSF, where the AS/RS’s base plates needed 105 PSF to distribute weight evenly. We had to recommend reinforcing that section with steel beams, a small adjustment that cost 10% of the total relocation budget, but saved them from a future crane collapse that would have shut down operations for six weeks. It’s not just floor load, either: ceiling height matters. If your new facility’s ceiling is 6 inches shorter than the old one, your crane’s upper travel limit will have to be modified, which means reengineering 15% of the machine’s structure. We once turned down a relocation request from a medical supply company because their new facility’s ceiling was 18 inches too low—cutting the crane’s reach would have reduced their storage capacity by 30%, which made the move financially unviable for them.

Next, there’s the disassembly phase, and this is where most companies go wrong when they try to cut corners. A lot of operations managers will look at a 20-foot steel crane beam and think, “That’s just a big metal stick—my maintenance team can take it apart.” But here’s the truth: AS/RS cranes are wired with custom industrial Ethernet cables, not standard extension cords, and their control systems are programmed with proprietary software that syncs with the facility’s warehouse management system (WMS). Disassembling without following OEM (original equipment manufacturer) specifications can break calibration, which means when you reassemble, the crane will misalign with the pick-up and drop-off points. Last year, a auto parts distributor in Detroit tried to move their pallet AS/RS with their in-house team. They skipped hiring our certified disassembly crew, cut some cables to save time, and when they reassembled, the crane’s travel axis was off by an inch. That small error caused the system to mispick 120 pallets of brake rotors in the first week, delaying orders to 30 dealerships and costing them $45,000 in rush shipping fees. We fixed the calibration, but that team learned a hard lesson: disassembly for AS/RS isn’t DIY. Our crew uses custom rigging tools, documents every cable and bolt with QR codes, and creates a 3D map of the system’s layout before removing anything—so reassembly is as accurate as the original installation.

Then there’s reassembly and testing, the phase that makes or breaks a relocation. Once the system is moved to the new facility, you can’t just bolt the crane back to the floor and turn it on. We spend an average of two weeks testing every component before a system is operational: first, we level the crane to within 0.1 degrees, then test the travel speed to make sure it doesn’t vibrate at high speed (vibration is a silent killer of AS/RS, leading to premature wear on gears and motors), and finally, we sync the control software with the new facility’s WMS. In 2021, a fashion e-commerce brand in Texas moved their mini-load AS/RS from a warehouse in Dallas to Austin. Their in-house team skipped the full calibration test and turned the system on three days after move-in. For the first 10 days, the crane dropped 17 bins of clothing—each valued at $300—because the sync between the crane’s software and the WMS had a 2-second delay. That delay meant the crane would arrive at the pick-up point a fraction of a second late, and the bin would slip off. We had to re-sync the software and adjust the crane’s timing, which cost them $5,100 in damaged inventory and 10 more days of partial operations. Now, our relocation packages include a 7-day full testing period as standard, so clients avoid those costly mistakes.

Of course, not all relocations are the same. Smaller systems, like mini-load AS/RS for storage of small parts, are far easier to move than large pallet cranes. We relocated a 12-module mini-load system for a jewelry brand in Atlanta in 2022, and the whole move—disassembly, transport, reassembly, testing—took just 10 days, with zero downtime. But a full pallet AS/RS, which can weigh 100 tons when fully assembled, needs specialized heavy transport, permits for oversize loads on highways, and coordination with building inspectors for structural modifications. That move can take 6 to 8 weeks, and cost up to 40% of the original system’s purchase price. It’s why we always tell clients to calculate that cost against the value of their existing system: if your AS/RS is 8 years old, and a new system would cost $2 million, relocating might be worth it if it saves you 60% of that, but if the system is 15 years old, the cost of relocation might be more than buying a new, more efficient model.

Another often-overlooked factor is compliance. AS/RS systems have to meet OSHA standards for industrial machinery, especially in areas like guardrails, emergency stop buttons, and fire suppression. When you relocate the system, you have to update your facility’s fire code and machinery safety inspections, which can add 10 to 15 days to the timeline if you’re not familiar with local regulations. We keep a log of compliance requirements for every state we operate in, so our team handles all permits and inspections as part of the relocation package—saving clients the hassle of navigating red tape on their own.

So why would a company consider relocating their AS/RS instead of buying new? The biggest reasons are space, labor, and supply chain shifts. During the pandemic, many consumer brands moved their operations from crowded coastal cities to inland warehouses with lower labor costs. One of our clients, a snack food manufacturer in California, moved their entire pallet AS/RS to a warehouse in Arizona in 2020. The move saved them $1.2 million in annual labor costs and gave them 25% more space for raw materials, which allowed them to expand production during a period of high demand. Another client, a pharmaceutical company in New Jersey, relocated their mini-load system to a new facility closer to their distribution centers, cutting delivery time for critical medications by 2 days.

But let’s be honest: relocation isn’t for everyone. If your AS/RS is more than 10 years old, its energy efficiency might be 30% lower than a new model, and the cost of moving plus retrofitting it for modern WMS software might not make sense. If your new facility’s layout is too small to accommodate the system’s footprint, or the structural requirements can’t be met without major renovations, relocating will be more expensive than building a new system from scratch. That’s why our first step with every client is a no-obligation assessment: we look at their old system, the new facility, their budget, and their timeline, and give them a clear answer on whether relocation is a good fit.

I’ve seen AS/RS move 100 miles across a state, and 5 miles across a city. I’ve seen them move as single modules for expansion, and as full systems when a company rebrands its entire operation. The common thread in every successful move is planning: starting with a structural survey, using certified technicians for disassembly, investing in full calibration and testing, and accounting for compliance and permit costs. The worst moves come from teams trying to save a few dollars by skipping those steps, leading to downtime, damaged inventory, and unexpected costs that far outweigh the savings.

If you’re thinking about relocating your automated storage retrieval machine, don’t leave it to chance. We’ve built our business on being transparent about what’s possible, what’s not, and what it will cost. Our team has 15 certified relocation technicians, all of whom have completed OEM training, and we’ve helped dozens of companies make the move without missing a single order. To learn more about your specific project, reach out to us to schedule a consultation. We’ll walk through every step, answer your questions, and help you decide if relocating your AS/RS is the right move for your business.

Rail Guided Vehicle System References

  1. Automated Storage and Retrieval Systems: Design, Selection, and Integration. Butterworth-Heinemann, 2019.
  2. OSHA Standards for Industrial Machinery Safety, 29 CFR Part 1910.
  3. Warehouse Automation Relocation Best Practices, Material Handling Industry Association, 2022.

Hefei Hagong Robot Co., Ltd.
With abundant experience, we are one of the most reliable automated storage retrieval machine manufacturers and suppliers in China. Please feel free to buy durable automated storage retrieval machine made in China here from our factory. Good service and quality products are available.
Address: Building C3, 2nd Floor, Intelligent Science Park, Economic and Technological Development Zone, Hefei City, Anhui Province
E-mail: hfhg2026@126.com
WebSite: https://www.hagongrobot.com/